0
+
Delegates
0
+
Exhibitors
0
+
Countries & Regions
0
%
C-level Decision-Makers
0
+ Hours
Hours of Social Networking
0
Supply-Demand Procurement Matchmaking Meetings
SOUTHEAST ASIA OFFSHORE MARKET: WHY NOW?
As global upstream investment pivots eastward, Southeast Asia is defining the next decade of offshore development with unprecedented project density

Over USD 100 billion in offshore CAPEX, 114 active projects spanning 9 countries, with a concentrated commissioning wave scheduled for 2026–2030. Global FPSO yard utilization has surpassed 85%, with delivery slots booked through 2029 and beyond. Project pipelines have never been fuller—yet delivery capacity has never been tighter. This supply-demand imbalance is your single greatest window of opportunity.

Register Now
Three Key Reasons
Tap Into Demands from 114 Ongoing Projects

There are 114 progressing offshore projects across Southeast Asia, spanning FPSO, LNG and other segments, with waves of project commissioning due from 2026–2030. This marks the final window to enter the project supply chain for the 2028–2030 development cycle.

Resolve Supply Chain Bottlenecks

Global dry dock utilization rates exceed 85%, with lead times for critical equipment deliveries extending beyond 2029. Suppliers capable of delivering quality outputs on schedule hold the strongest bargaining power in the market. This conference facilitates your connections with EPC players and helps you navigate localisation compliance frameworks defined by PETRONAS and TKDN.

Gain Decision-Maker Information Advantages

Crucial intelligence including PETRONAS’ localisation rate requirements and SBM’s subcontracting frameworks cannot be found in technical manuals. Such insights only emerge in closed-door discussions among decision-makers from oil operators, EPC contractors and tier suppliers. Secure this information edge at an early stage to strengthen your chances of securing purchase orders.

Who Will Attend? Core Decision-Makers Across the Industry Supply Chain Have Confirmed Their Participation
OAP precisely targets decision-makers across all critical links of the industrial chain. Meaningful dialogue only happens when the right stakeholders sit at the same table.
Oil Operators / National
Resource Authorities
Over USD 100 billion FID projects to kick off across Southeast Asia, with continuously tightening local
procurement rules. On-site supply chain validation mitigates uncertainties in investment decisions.
Floating Asset Operators &
Lessors
Only 15 global firms hold full FPSO EPC & operation capacity, with shipyard slots fully booked through
2028. Early entrants secure production capacity; latecomers face long waiting queues.
FPSO & Subsea EPC /
Integrators
Topside module delivery cycle: 24–36 months; subsea tree lead time: 18–24 months. NORSOK-certified
fabricators have no available slots until 2029. Failing to lock capacity 18 months in advance exposes projects
to delay risks.
Engineering Design &
Project Management Firms
FEED phase determines 80% of total project expenditure. Southeast Asia lacks sufficient local deepwater
design capacity; FEED holders act as gatekeepers to the entire supply chain.
Shipyards &
Module Fabricators

Chinese yards build 70% of global FPSO hulls, yet there exists a 30%+ capacity gap for high-end modules
with very limited NORSOK-qualified manufacturers. Production capacity is a hard constraint; capacity
reservation locks in delivery schedules.
Core Technology &
Equipment Suppliers
Subsea trees require 18–24 months lead time, with merely 3 global deepwater-grade suppliers; gas turbine
delivery slots stretch to 2029–2030 with a 15–20% price hike. All single-point mooring systems rely on
imports; 120mm+ anchor chains carry an 18–24 month delivery window. Lead times of critical long-cycle
equipment directly determine on-schedule project commissioning.
Financial Leasing &
Investment Institutions
Single FPSO investment ranges from USD 1–2.5 billion. A mere 1% swing in financing structure translates to
multi-million-dollar cost variances. Optimal financing packages can only be structured with full market
intelligence.
Regulatory Bodies and Industry Associations

These authorities formulate localisation policies and industry entry criteria that exert direct impacts on project approvals and supply chain compliance. Their on-site briefings on the latest regulatory updates serve as an essential gateway for market entry across the region.
OAP 2027: Four Closed-Loop Support Modules for End-to-End Business Matchmaking
How will you strategize to seize a competitive edge at the 2027 Offshore Asia Pacific Conference?

Across the two-day main forum, there will be 11 themed roundtables and 2 closed-door exclusive sessions. The agenda covers core topics spanning the entire Asia-Pacific offshore industry value chain, including offshore investment in the region, FPS project financing, digital operation and maintenance, offshore decarbonisation, as well as subsea production systems. These sessions facilitate in-depth discussions with decision-makers from oil operators and EPC firms.

A dedicated offshore exhibition will run concurrently alongside the conference, bringing together over 60 global enterprises across the industrial value chain. Exhibitors will showcase complete FPSO, FLNG and FSRU solutions, subsea production hardware for oil extraction, shipyard module fabrication, as well as low-carbon digital offshore solutions, offering tangible on-site demonstrations of their project delivery capabilities.

The organising committee pre-screens and matches suppliers against buyer qualification requirements to arrange over 200 targeted one-on-one procurement meetings. All participating buyers hold FID-approved ongoing projects and confirmed procurement budgets. These prearranged sessions help suppliers get onto owners' vendor shortlists in advance and drastically shorten project lead times for collaboration.

A 3-day cross-border industry tour will be arranged following the main conference, covering three tiers of Southeast Asia’s industrial ecosystem: regional energy decision-making headquarters, operational hubs for floating-asset EPC contractors, and local offshore manufacturing bases. The on-site visits will deliver in-depth insights into national localisation compliance thresholds across markets as well as the actual production capacity landscape along the full industry value chain.

Phone:
180 1917 7420
Email:
ritaw@cdmc.org.cn
Official Address:
Tower T1, LJZ Riverside Center, No. 10, Lane 257, Shanghai
service qrcode
Official WeChat